Free CAPM Practice Test Questions and Answers (2026) | Cert Empire Practice Questions

Free preview: 20 questions.

Already purchased? Log in

PMI CAPM.pdf

View Mode
Q: 1
After winning a large government contract, a company needs to hire a portfolio manager What vital qualification should candidates possess?
Options
Q: 2
Ensuring that both parties meet contractual obligations and that their own legal rights are protected is a function of:
Options
Q: 3
An input of the Plan Procurement Management process is:
Options
Q: 4
Definitions of probability and impact, revised stakeholder tolerances, and tracking are components of which subsidiary plan?
Options
Q: 5
What is the probability of occurrence if the risk rating is 0.56 and the impact if the risk does occur is very high (0.80)?
Options
Q: 6
The iterative and interactive nature of the Process Groups creates the need for the processes in which Knowledge Area?
Options
Q: 7
The ways in which the roles and responsibilities, reporting relationships, and staffing management will be addressed and structured within a project is described in the:
Options
Q: 8
Which Control Quality tool is also known as an arrow diagram?
Options
Q: 9
When a permitting agency takes longer than planned to issue a permit, this can be described as a risk:
Options
Q: 10
A project manager seeking insight on previous stakeholder management plans and their effectiveness should evaluate:
Options
Q: 11
A key benefit of the Manage Communications process is that it enables:
Options
Q: 12
Which of the following statements is true regarding project and product lifecycles?
Options
Q: 13
In which domain of project management would a Pareto chart provide useful information?
Options
Q: 14
Which of the following processes audits the quality requirements and the results from quality control measures to ensure appropriate quality standards and operational definitions are used?
Options
Q: 15
Control charts, flowcharting, histograms, Pareto charts, and scatter diagrams are tools and techniques of which process?
Options
Q: 16
In a project, total float measures the:
Options
Q: 17
Which type of analysis is used to examine project results through time to determine if performance is improving or deteriorating?
Options
Q: 18
The degree of uncertainty an entity is willing to take on in anticipation of a reward is known as its risk:
Options
Q: 19

DRAG DROP Match the influence with its corresponding category of influence. PMI CAPM question

Drag & Drop
Q: 20

DRAG DROP Match each tool or technique with its corresponding Project Cost Management process. PMI CAPM question

Drag & Drop
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE