Q: 1
During a coordination meeting, project leads ask for a report showing only active clashes between mechanical systems and structural framing in patient-room zones, following the approved clash matrix. What is the most effective way to provide this report using Model Coordination?
Options
Q: 2
A Revit model has become very slow for the team immediately after a regularly scheduled file distribution across all disciplines. What two steps can the BIM manager take to review issues across the connected files? (Select two.)
Options
Q: 3
What setting should be defined in the Family Template for Mechanical Equipment families intended for use in projects in specific countries?
Options
Q: 4
Which of the following would typically be included in an AECO BIM data handover package at project closeout?
Options
Q: 5

A client has provided a resource model with many custom shared parameters required to meet the project data-management requirements across all of its projects with the firm. The BIM manager has extracted those parameters to the Parameters Service for wider firm access. Which tool should a team member use to load the new shared parameters into a project model? (Select the correct tool on the image.) Autodesk BIM MGT 101 question

Your Answer
Q: 6

A campus project of several duplicated links of a building model has received an updated civil background, with revised GIS coordinates. Drag and drop to indicate the correct order of steps the BIM manager should perform to revise the architectural model. Autodesk BIM MGT 101 question

Drag & Drop
Q: 7
A client is seeking bids from a range of possible fabricators to determine which will win the contract to join the team. What settings in Autodesk Forma allow a team to distribute files to a party that is not a project member?
Options
Q: 8
A project team has been ignoring their model warnings, and from talking with the team, it is apparent that they are intimidated by the number of warnings and unwilling to tackle resolving them. What steps can the BIM manager take to educate the team and alleviate their reluctance to address these issues?
Options
Q: 9
A design team is distributing models to a construction team’s coordinator, who reports that the various models are not aligned to each other when linked into the coordination environment. What step should the design team’s lead BIM manager take to resolve the positioning issue?
Options
Q: 10
A BIM manager is preparing to share a federated model package with an external cost estimator. The estimator only needs access to quantities and location-based metadata, but not design intent or proprietary elements from other teams. What is the first step the BIM manager should take to ensure appropriate use and minimize data- related risk?
Options
Question 1 of 20

Premium Access Includes

  • ✓Quiz Simulator
  • ✓Exam Mode
  • ✓Progress Tracking
  • ✓Question Saving
  • ✓Flash Cards
  • ✓Drag & Drops
  • ✓3 Months Access
  • ✓PDF Downloads
Get Premium Access
Scroll to Top