Free PDD Practice Test Questions and Answers (2026) | Cert Empire Practice Questions
Free preview: 20 questions.
NCARB PDD
Q: 1
What is the primary purpose of shop drawings?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 2
In an air-conditioned space in a tropical environment, roof insulation is being applied above a
structural deck. In order to avoid problems related to condensation, where should the vapor barrier
be installed?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 3
For the same moment, a glue-laminated beam would require a section modulus of what proportion
relative to a sawn timber beam? (Assume Fᵦ of the glue-laminated beam is 2,400 psi and Fᵦ of the
sawn lumber beam equals 1,200 psi.)
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 4
Which of the following methods of mortar joint finishing has the greatest weatherability?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 5
A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning
code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a
new facility on their existing site. The building will be open to the public and include a brewery,
distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the
50% construction documents review.
To accommodate a compressed construction schedule, the Owner will be utilizing a design-build
process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to
the Architect for review, due to the lead time on this critical path item. Once construction begins,
farming operations must be able to continue uninterrupted.
Key project information includes:
Brewing and distilling will operate year-round.
Brewery will initially include four fermenting tanks. Owner has requested space for at least two
additional tanks. Potential expansion will be based on future sales.
Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are
required.
Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have
views to the working orchards and the historic buildings on site.
Tap Room is scheduled to be open from August through November. Owner would like options to
extend operating dates based on popularity.
The Market area will feature local farm products and is not conditioned.
Entire building will be fully sprinklered.
Selected building materials are low-maintenance, as requested by the Owner, for durability and to
reflect the nature of a working farm.
Mechanical and electrical systems will be hung from the building structure. These loads are included
in PEMB shop drawings.
Public water and sewer is not available at the Project Site.
Occupancy sensors are included to reduce utility costs and achieve energy conservation
requirements.
The following resources are available for your reference:
Architectural Drawings, including plans, elevations, sections, and schedules
Consultant Drawings, including structural, HVAC, power distribution, and plumbing
PEMB Shop Drawings
Design and Construction Schedule
Specification Excerpts, showing relevant spec sections
IBC and ADA Excerpts, showing relevant code and accessibility sections
After reviewing the documents, the architect discovers a coordination issue in the corridor.
Per the current energy code, the building envelope requirement for walls above grade in this climate
zone is R13 + R10c.i.
What specification section must be added to the project?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 6
The walls of typical light wood-frame buildings can most economically be made resistive to lateral
shear forces, without major alteration to the existing structure, through the use of which one of the
following?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 7
Which document is the most appropriate location for specifying the finish material for casework?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 8
Refer to the exhibit.
Refer to the exhibit.
For a plywood panel carrying the grade stamp shown, which of the following is the maximum
recommended span for use in a floor system?
Refer to the exhibit.
For a plywood panel carrying the grade stamp shown, which of the following is the maximum
recommended span for use in a floor system?Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 9
Which of the following metals is best suited for embedments in concrete or masonry?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 10
Which of the following must be considered in the proper selection of thermal insulation and
moisture control assemblies for a building? (Check all that apply)
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 11
Temporary shoring of a masonry wall should remain in place until what point?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 12
Refer to the exhibit.
Refer to the exhibit.
For which of the following connections could diagonal bracing be eliminated?
Refer to the exhibit.
For which of the following connections could diagonal bracing be eliminated?Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 13
In which of the following locations should wood building products be pressure treated when used in
a climate that promotes decay? Check the four that apply.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 14
Given the information below, which of the following is the cost of 1,850 sq. ft. of brick veneer?
Cost of brick – $500 per 1,000 brick
Cost of masonry cement, sand, etc. – $160 per 1,000 brick
Cost of labor – $675 per 1,000 brick
680 bricks per 100 sq. ft.
5% waste of material
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 15
During plan review of an office building, the reviewer informs the architect of new regulations that
require storage rooms greater than 150 sf be 1-hour fire rated. The proposed design has three 200 sf
storage rooms that must meet the fire protection requirements. The architect needs to recommend
how to meet this requirement with minimal effect on cost, time, and program.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 16
Refer to the exhibit.
Refer to the exhibit.
It is required to cut a hole in the web of the beam shown.
Which of the locations would be best? Check the two that apply.
Refer to the exhibit.
It is required to cut a hole in the web of the beam shown.
Which of the locations would be best? Check the two that apply.Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 17
An architect is designing a sub-surface drainage system that outfalls into a site retention pond. The
recommended shape, size, and slope of the drainage lines need to be determined for primarily which
of the following purposes?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 18
What is the most destructive factor affecting the durability of mortar joints?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 19
HOTSPOT
Refer to the exhibit.
Construction document drawings are in the final review stages. The architect needs to coordinate the
casework detail with the probable cost estimate.
Click on the drawing note in the casework section that does not align with the cost estimate.

Refer to the exhibit.
Construction document drawings are in the final review stages. The architect needs to coordinate the
casework detail with the probable cost estimate.
Click on the drawing note in the casework section that does not align with the cost estimate.

Your Answer
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 20
HOTSPOT During drawing review, a discrepancy is found between the drawings and room 101 on the finish schedule. Click in the cell on the room finish schedule that does not match the drawings. 
Your Answer
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Question 1 of 20