Free FIELD-SERVICE-LIGHTNING-CONSULTANT Practice Test Questions and Answers (2026)

Last Update Check

View Mode
Q: 1
Which two configurations can companies add to brand the Field Service mobile app?
Options
Q: 2
Universal Containers typically performs installs, break-fix, and inspections for all clients. The Service Manager wants to create a template for common work requests. What should a Consultant implement to assist the dispatch team?
Options
Q: 3
A dispatcher of a local power outage. All appointments in the affected area must be rescheduled to a different day How should the dispatcher update the service appointment?
Options
Q: 4
universal container want to dispatch group of service appointment to there technician the number of service appointment dispatched at the time varies among different services territories Which two settings should a consultant enable to ensure the service appointments? are dispatched correctly?
Options
Q: 5
which two considerations impact the scheduled time frame of multi-day work? Choose 2 answers
Options
Q: 6
Universal Containers sells widgets with multiple components. Based on a problem reported by a customer, one or more of the components need to be replaced. What should a Consultant recommend to accurately record the required work?
Options
Q: 7
universal container technicians have 12 mandatory company holidays each calendar year. Technician need view all of their absence records at once Which two applications should a consultant recommend to meet this requirement? Choose 2 answers
Options
Q: 8
universal containers wants to report on the volume of products installed within a specific timeframe. Which solution should the consultant utilize to meet the requirement?
Options
Q: 9
Universal containers want to track the full lifecycle of an installed product, including when a swap is needed as part of a service order. Which steps technicians follow to report that a substitute asset is installed?
Options
Q: 10
universal container wants its technician to follow a standard operating procedure (S O P) while performing maintenance on an individual asset. Each operation should be captured independently to allow technician to enter note and update status they progress with the work preventative maintenance should be with a single visit Which data model should the consultant recommend to the universal container?
Options
Q: 11
Universal containers wants to dispatch emergency work identified throughout the day that needs to completed before lower-priority work. What should the consultant recommend to meet this requirement?
Options
Q: 12
Service resources at universal container UC frequently work in more than one service territory the current scheduling policy looks only at primary territory while us still want to optimizer to use the service resource primary when scheduling, UC also wants the scheduling policy to look at the resources secondary services territory Which two scheduling policy changes should a consultant recommend? Choose 2 answers
Options
Q: 13
Which fields on service appointments help ensure that they are completed within the agreed upon service level agreement (SLA) with universal containers customers?
Options
Q: 14
universal container UC uses two contractors 1 and contractor 2 to perform repair work contractor 1 has provided service for UC for longer period time and considered to have more repair work expertise then contractor 2 How should a consultant configure the contractors experience?
Options
Q: 15
A Dispatcher at Universal Containers has just been informed that one of their field employees, who has five services schedules for today, called in sick. How should the workload be assigned to other Field Technicians?
Options
Q: 16
Universal Containers performs service which may require more than one task on a Work Order. A Consultant has recommended Work Order Line Items to manage the task(s). What should be considered as part of this solution to ensure tasks are dispatched?
Options
Q: 17
Universal Containers wants to reduce their mean-time-to-service. Which three Field Service processes should a Consultant recommend to accomplish this goal? Choose 3 answers.
Options
Q: 18
Universal Containers (UC) wants to measure their adherence to specific SLAs for all Work Orders. In which order should a Consultant Implement the setup to achieve this requirement?
Options
Q: 19
Universal Containers needs to implement a way to track all internal and external work associated with an inbound contact center request. How should a Consultant recommend tracking the work?
Options
Q: 20
Universal Containers wants to help their dispatchers determine the length of time a Work Order should last. What should the Consultant implement to help achieve this goal?
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top