Free CLSSGB-001 Practice Test Questions and Answers (2026) | Cert Empire Practice Questions

Free preview: 20 questions.

Already purchased? Log in

GAQM CLSSGB 001

View Mode
Q: 1
The difference between the largest observation and the smallest observation in the data set is known as the _______________.
Options
Q: 2
Which statement(s) are true about the Fitted Line Plot shown here? (Note: There are 2 correct answers).
Options
Q: 3
A Stable process is a process whose output is consistent over time. A primary tool used to analyze Stability would be a ________________.
Options
Q: 4
In the late 1980’s William Smith coined the name Six Sigma for a methodology that had its origins at __________________ for quality related work being done there.
Options
Q: 5
This output is what type of advanced Capability Analysis?
Options
Q: 6
This output is what type of advanced Capability Analysis?
Options
Q: 7
Some of the approaches used in Lean include station warning lights, tool boards and jidohka devices in order that which of these apply?
Options
Q: 8
According to a manager it takes an average weekday commute of 39 minutes with a Standard Deviation of 7 minutes for the employees to get to work while they use their personal vehicles for their office commute while the management set a policy of not more than 40 minutes for their daily one-way commute. A survey conducted one day on 70 employees showed an average of 34 minutes commuting time using the metro public transportation system with a Standard Deviation of 21 minutes. If the Standard Deviation is uncontrollable then the other option to increase the probability of coming in on time via personal vehicles to work could be ____________?
Options
Q: 9
When a Belt is analyzing sample data she should keep in mind that 95% of Normally Distributed data is within +/- 2 Standard Deviations from the Mean.
Options
Q: 10
The Lean Principle action in the 5S approach that deals with having those items needed regularly at hand and those items need less regularly stored out of the way is known as ___________.
Options
Q: 11
As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.
Options
Q: 12
Non-parametric testing is done when which of these are applicable? (Note: There are 3 correct answers).
Options
Q: 13
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
Options
Q: 14
Lean Enterprise is based on the premise that anywhere work is being done which of these is also occurring?
Options
Q: 15
The generation of a Regression Equation is justified when we _____________. (Note: There are 4 correct answers).
Options
Q: 16
The practice of utilizing Poka-Yoke is also known as ________________.
Options
Q: 17
When looking at a distribution graph, the Mean is defined as the __________.
Options
Q: 18
What is the Cycle Time, in seconds, for a process having a Throughput of 7,200 units per hour?
Options
Q: 19
The term FMEA is an abbreviation for Failures Measure Effective Automation.
Options
Q: 20
Conducting a viable Capability Analysis using Attribute Data one must obtain a fairly large sample set to be statistically sound.
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE