Should the FinanceApp service be set to Automatic and started after updates, and for MarketApp switch the log on account from TestAccount to Local System? Really clear scenario, similar to the ones in recent practice sets.
An administrator is troubleshooting performance issues on a server that was recently upgraded. The administrator met with users/stakeholders and documented recent changes in an effort to determine whether the server is better or worse since the changes. Which of the following would BEST help
answer the server performance?
Makes sense to compare against a baseline. "A server baseline" is the best way to measure if things improved or got worse after changes. You need data from before and after for real analysis. Pretty sure that's the key here, agree?
HOTSPOT
A systems administrator deployed a new web proxy server onto the network. The proxy server has two interfaces: the first is connected to an internal corporate firewall, and the second is connected to an internet-facing firewall. Many users at the company are reporting they are unable to access the Internet since the new proxy was introduced. Analyze the network diagram and the proxy server’s host routing table to resolve the Internet connectivity issues.
INSTRUCTIONS Perform the following steps:
1. Click on the proxy server to display its routing table.
2. Modify the appropriate route entries to resolve the Internet connectivity issue.
If at any time you would like to bring back the initial state of the simulation, please click the Reset All button.
Default gateway assignment or routing table order? If the question wants the first fix or best long-term fix, it might change which route to modify on the proxy. I saw a similar scenario in official labs and usually, "best" means changing the default gateway towards the internet-facing firewall, but if they're just asking "first", maybe A is closer.
DRAG DROP
A recent power Outage caused email services to go down. A sever administrator also received alerts from the datacenter’s UPS. After some investigation, the server administrator learned that each POU was rated at a maximum Of 12A.
INSTRUCTIONS
Ensure power redundancy is implemented throughout each rack and UPS alarms are resolved. Ensure the maximum potential PDU consumption does not exceed 80% or 9.6A).
a. PDU selections must be changed using the pencil icon.
b. VM Hosts 1 and 2 and Mail Relay can be moved between racks.
c. Certain devices contain additional details

If the subnets are mismatched, even valid IPs won't help, right? I think a wrong subnet mask on either side means they'll think they're on different networks and can't talk directly.
Gotta be D. Only QSFP+ out of these options actually supports 40Gb networking, the rest top out way lower (like SFP+ at 10Gb). I'd double-check the official CompTIA Server+ objectives or hardware guides if unsure, but pretty sure that's what you'll see in their practice tests and labs. Feel free to correct me if I missed something!