A recent power Outage caused email services to go down. A sever administrator also received alerts from the datacenter’s UPS. After some investigation, the server administrator learned that each POU was rated at a maximum Of 12A.

INSTRUCTIONS

Ensure power redundancy is implemented throughout each rack and UPS alarms are resolved. Ensure the maximum potential PDU consumption does not exceed 80% or 9.6A).

a. PDU selections must be changed using the pencil icon.

b. VM Hosts 1 and 2 and Mail Relay can be moved between racks.

c. Certain devices contain additional details

Drag & Drop
Question 16 of 35