Q: 16
DRAG DROP
A recent power Outage caused email services to go down. A sever administrator also received alerts from the datacenter’s UPS. After some investigation, the server administrator learned that each POU was rated at a maximum Of 12A.
INSTRUCTIONS
Ensure power redundancy is implemented throughout each rack and UPS alarms are resolved. Ensure the maximum potential PDU consumption does not exceed 80% or 9.6A).
a. PDU selections must be changed using the pencil icon.
b. VM Hosts 1 and 2 and Mail Relay can be moved between racks.
c. Certain devices contain additional details

Drag & Drop
Discussion
Looks like VM Host 1 should go to Target 1 and Mail Relay to Target 2, based on load balancing and not exceeding the PDU threshold. This fits with keeping both power redundancy and max draw under control. Pretty sure this is how you avoid those UPS alarms.
Yep, Zoe's got it. VM Host 1 goes to Target 1 and Mail Relay to Target 2-keeps both racks under 9.6A and spreads the load for redundancy. That's the way to clear those UPS warnings.