Q: 1
How does the system behave if the network cannot sustain the data change rate required to maintain a 1-minute RPO between the primary and recovery AZs?
Options
Q: 2
After a storage failover in a synchronous replication environment, users report higher I/O latency and degraded performance compared to pre-failover levels. Cluster health is normal, and replication is functioning correctly. Which post-failover cleanup action could the administrator perform to correct the performance issue?
Options
Q: 3

What must the maximum Round Trip Latency be less than between a Witness VM and Metro Availability PDs?

Options
Q: 4
What must be installed on a guest VM prior to enabling Self-Service Restore?
Options
Q: 5

An administrator is preparing to configure DR between an on-prem AZ and Nutanix Cloud AZ. Replication fails immediately after configuration. Which prerequisite should be verified?

Options
Q: 6

A VM is protected in an Async Protection Policy with a schedule for every 1 hour. The replications are completing successfully every hour. The VM hosts a critical application and cannot afford any data loss. The administrator unprotects the VM from the Async Policy and protects the VM in a Synchronous policy. The administrator also notices that the VM is not entering the "Sync" state and is stuck in syncing for a long time. The administrator notices the error in the logs: Enabling stretch for entity TestVM failed while notifying vm service due to error Acropolis failed to handle VmSyncRepEnable request for VM TestVM Failed to connect to remote Anduril What port needs to be allowed between the clusters to fix the issue?

Options
Q: 7
An administrator logs into Prism Central (PC) and notices that a replication of a recovery point is still ongoing from Cluster A to Cluster B on a new setup. The bytes being replicated aren't changing. Both site's virtual IP addresses are reachable. Connectivity between PC/PE is good. There is a dedicated LAN between the clusters. What could be causing this replication to be stuck?
Options
Q: 8
A remote office deployment consists of a two-node Nutanix hybrid cluster. An administrator attempts to configure a protection domain with a 5-minute RPO (Nearsync) replicating to a central datacenter. Why is the administrator unable to successfully configure this Nearsync schedule?
Options
Q: 9
An administrator incorrectly used the "Activate" functionality on the PD to test failover of VMs from production to DR cluster. The VMs were successfully restored on the DR side. What steps are needed to clean up the VMs on the DR side and resume normal operations on the Production cluster?
Options
Q: 10

An administrator needs to perform a test failover on a Recovery Plan. What is the primary goal of this action?

Options
Question 1 of 20 · Page 1 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE