Benefits and working conditions would be primarily the concern of which of the following?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
B
Q: 2
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma
project and should therefore involve keeping the __________ up to date as a means of supporting
the Response Plan.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 3
If a set of data is generally centered relative to the targeted value but is rather widely disbursed it
would be said to be _____________.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
B
Q: 4
Which of the following would likely not be a CTQ (Critical-to-Quality) for the purchase of a product?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 5
In the expression Y = f(Xn) Y, the output, is the ___________ variable and Xn, the inputs, are the
__________ variables.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 6
When we create a Process Map we use a __________ to show the direction of work flow.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 7
An important factor in a viable Control Plan is to determine who, when and to what level various
personnel must be _________ to maintain the improvements made to a process.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 8
Al bought a handheld GPS from his local electronics store. When he entered an address it would not
function. For the manufacturer of the GPS this would be categorized as what type of cost?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 9
Measurement System Analysis is a procedure used to quantify variation of the method or system
used for taking measurements and used to assure usable data is collected.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 10
One of the primary objectives of constructing an X-Y Diagram is to separate the vital few X’s from the
trivial many X’s.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 11
A Belt has determined that the insurance claim form needn’t be reviewed by accounting thereby
improving the number of claims a processer can handle. According to Cost of Poor Quality (COPQ)
definitions RTY improvement would be considered _______________.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 12
With a Fishbone Diagram we use the legs to define each source of a potential defect and along the
legs we enter each potential means by which a defect could be introduced into our process.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 13
Six Sigma refers to a process whose output has 100% of its data points within 8 Standard Deviations
from the Mean.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 14
Voice of the Business is a Lean Six Sigma technique to determine the needs and wants of the
______________ of the business.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 15
To reduce the people or operator introduced defects into a process it is best if a Belt can design and
implement a means of ________________ into the process.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 16
One of the primary deliverables from performing a SIPOC is to begin to understand which inputs
have the greatest affect on the ____________ most valued outputs.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 17
Y, the output of a process, is the ______________ variable while Xn, the various inputs to a process,
are the _____________ variables.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 18
A tool we use to identify possible failures (defects) in our process and the impact they may have is
the _________________.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 19
SIPOC stands for Suppliers, Inputs, ___________ , Output and Customers.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
B
Q: 20
The Pareto Chart is a tool that displays data that typically follows what ratio?