Free Practice Test

Free LEED AP O+M Practice Test Questions and Answers (2026) | Cert Empire

US Green Building Council LEED AP O M

View Mode
Q: 1
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?
Options
Q: 2
Which of the following is an allowable method to increase cooling tower cycles of concentration?
Options
Q: 3
Which of the following options about project boundaries is correct?
Options
Q: 4
A management method that could be included in a project's site management policy is the use of
Options
Q: 5
A cafeteria purchases $325.00 USD worth of United States Department of Agriculture (USDA) Organic Certified produce from a farm located 50 mi. (80 km) from the project building during the performance period. What is the maximum allowable value for this purchase that can be claimed towards Materials and Resources Credit, Purchasing- Ongoing?
Options
Q: 6
What strategy should be performed if submetering of the irrigation system is not available or difficult to implement for an existing building to comply with the Sustainable Sites Credit, Site Management?
Options
Q: 7
Which of the following strategies will qualify for an exemplary performance point under Innovation Credit, Innovation, Option 3. Additional Strategies?
Options
Q: 8
A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?
Options
Q: 9
Which system can significantly reduce or completely eliminate the amount of potable water used for irrigation?
Options
Q: 10
Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?
Options
Question 1 of 10

Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE