Free LEED AP ID+C Practice Test Questions and Answers (2026) | Cert Empire Practice Questions

Free preview: 20 questions.

Already purchased? Log in

US Green Building Council LEED AP ID C

View Mode
Q: 1
Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?
Options
Q: 2
Which of the following are regularly occupied spaces in a commercial application?
Options
Q: 3
A tenant implements the following strategies to reduce the amount of water used. Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?
Options
Q: 4
Which of the following prerequisites or credits is affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit, Thermal Comfort?
Options
Q: 5
A mechanical engineer needs to determine the number of carbon dioxide monitors needed for the public area of a hotel. The public area includes the hotel front desk, the hotel lobby, two public restrooms and one corridor. The aim is to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Additional Enhanced IAQ Strategies, Part C. Carbon Dioxide Monitoring. The project's LEED AP should recommend a minimum of how many CO2 monitors?
Options
Q: 6
When developing the overall energy strategy of the project, which credit should the client consider to work synergistically with the Energy and Atmosphere Credit, Enhanced Commissioning, on an ongoing basis?
Options
Q: 7
Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?
Options
Q: 8
A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?
Options
Q: 9
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
Options
Q: 10
A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?
Options
Q: 11
To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?
Options
Q: 12
A project owner is seeking Location & Transportation Credit, Surrounding Density and Diverse Uses for an office that is being relocated. In order to promote walkability and reduce the distance driven by employees, which of the following solutions should the project owner consider?
Options
Q: 13
In a goal-setting workshop, a decision is made to place circulation at the exterior of the office perimeter next to the window wall. Which of the following is an example of integrated decision- making?
Options
Q: 14
Best practices recommend that the LEED AP confirm that minimum program requirements have been met
Options
Q: 15
When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?
Options
Q: 16
The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?
Options
Q: 17
Design is underway for a new tenant suite with 4,000 ft2 (371.6 m2) of net occupiable are a. The project build-out will include all new HVAC systems. Operable windows are installed as follows: · A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces . A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
Options
Q: 18
For Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification, the final Cx report must include the
Options
Q: 19
A Client is fitting out a building with area 20,500 ft2 (1 904.5 m2) and wishes to pursue the Energy and Atmosphere Credit, Enhanced Commissioning. Who may be appointed as the Commissioning Authority (CxA) for the project?
Options
Q: 20
In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE