Free FLASHARRAY-IMPLEMENTATION-SPECIALIST Practice Test Questions and Answers (2026) | Cert Empire Practice Questions

Free preview: 20 questions.

Already purchased? Log in

Pure Storage FLASHARRAY IMPLEMENTATION S…

View Mode
Q: 1
On a FlashArray//XR20R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?
Options
Q: 2
Before installing array rails, where should the cage nuts be placed?
Options
Q: 3
What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?
Options
Q: 4
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?
Options
Q: 5
A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the array configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet this requirement?
Options
Q: 6
In a situation where iSCSI cards need to be re-used during a controller upgrade, which is a valid transfer path?
Options
Q: 7
When performing an install on a FlashArray, what step should be taken first?
Options
Q: 8
The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?
Options
Q: 9
A customer would like to reduce SafeMode settings for retention and eradication with their current policy. How is authorization obtained to make the requested changes?
Options
Q: 10
What is the redundancy of the FlashArray//XL PSUs?
Options
Q: 11
What is the speed of the Ethernet ports to connect a FlashArray //E to a DFS?
Options
Q: 12
An Implementation Engineer is onsite to install a new DFM data pack (DP) to CH0.BAY10-CH0.BAY19 of a FlashArray. After adding the drives to the chassis, which command should the Implementation Engineer run to verify if the new DP is in a wide write group?
Options
Q: 13
What are the interface names for a 4-port FC card in slot 1 in an XR2/3 array?
Options
Q: 14
After performing a hardware upgrade from an //M20R2 to a //X20R3-EMEZZ, a customer wants to add a Direct Flash Modules data pack to replace the existing SAS Chassis Data Packs (2x 20TB DPs). What extra hardware is required?
Options
Q: 15
A customer has filled out the Installation Workbook. The management IP information netmask is specified as “255.255.255.223” and the gateway is specified as “10.24.18.1”. What corrective action should be taken to reconcile the IP configuration?
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE