Free EXIN-CDCP Practice Test Questions and Answers (2026) Practice Questions

Free preview: 20 questions.

Exin CDCP

View Mode
Q: 1
What should be a consideration when having casters (rollers/wheels) or feet under the rack?
Options
Q: 2
What should be taken into consideration when using patch cables?
Options
Q: 3
What is the best practice for cutting holes in the raised floor tile?
Options
Q: 4
Mean time between failures is best considered a measure of:
Options
Q: 5
Do I need to check the local standards if I already comply to international standards?
Options
Q: 6
Sprinkler heads used in computer rooms activate at what temperature?
Options
Q: 7
Which design consideration should be implemented with an Inergen-based fire suppression system?
Options
Q: 8
Where should exit/emergency signs be located?
Options
Q: 9
What is the main risk for a data centre when the water supply fails?
Options
Q: 10
Can Electro Magnetic Fields (EMF) cause data centre failures?
Options
Q: 11
What is the current recommended temperature for ICT equipment as described in the ASHREA TC 9.9 guideline?
Options
Q: 12
Does unplanned downtime of a data centre have an impact on the business results?
Options
Q: 13
What is the purpose of a service corridor?
Options
Q: 14
Looking from within the Computer room, what should the door-swing (opening) direction be?
Options
Q: 15
An optical fiber cable comes with the specifications 50/125 um. What do the numbers represent?
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE