BCS CTFL4
Q: 1
Which of the following statements about the testing quadrants is TRUE?
Options
Q: 2
A typical objective of testing is to
Options
Q: 3
Who of the following has the best knowledge to decide what tests in a test project should be
automated?
Options
Q: 4
Which of the following statements is true?
Options
Q: 5
A test status report SHOULD:
Options
Q: 6
Consider the following examples of risks identified in different software development projects
[1]. It may not be possible to generate the expected workloads to run performance tests, due to the
poor hardware equipment of the machines (load injectors) that should generate these workloads.
[ii]. A user's session on a web application is not invalidated after a certain period of inactivity
(configured by the system administrator) of the user,
[iii]. The test team will not have an adequate requirements specification (since many requirements
will still be missing) by the time test design and analysis activities should begin according to the test
plan.
[IV]. Following a failure, the system is unable to continue to maintain its pre-failure operation and
some data becomes corrupted.
Which of the following statements is TRUE?
Options
Q: 7
The four test levels used in ISTQB syllabus are:
1. Component (unit) testing
2. Integration testing
3. System testing
4. Acceptance testing
An organization wants to do away with integration testing but otherwise follow V-model. Which of
the following statements is correct?
Options
Q: 8
You are an experienced tester on a project with incomplete requirements and under pressure to
deploy.
What type of testing should you do?
Options
Q: 9
In addition to thorough testing of the requirements specification, a development team aims to
involve users as early as possible in the development process, using practices such as prototyping, to
ensure that the software systems being developed will meet the users' expectations. This approach is
especially useful at mitigating the risks associated with one of the seven testing principles, which
one?
Options
Q: 10
Determining the schedule for each testing activity and test milestones for a test project, using activity
estimates, available resources, and other constraints is a typical task performed during
Options
Question 1 of 10