Q: 1
You have assembled the following cost of quality numbers 200 defects were found prior to release
and 100 were found after.
Given this information what is the total cost of quality for this project?


Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 2
Which three of the following would be considered a good mix of technical and interpersonal skills
(hard and soft), for a test team leader?
a. Ability to compliment a developer.
b. Presenting information regarding a test project progress to stakeholders
c. Using a configuration management tool.
d. Ability to read a development coding language
e. Assessing a failure and documenting it correctly.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 3
You are planning the testing for an emergency product update required to correct a serious security
issue and to improve system maintainability of a key product in your company's catalogue. It has
been estimated that the historical cost to the company for the security issue in this system has been
$375,000.
In the last year a total of 10 reported "live' incidents were reported, resulting in a total external
failure cost of S110.000 to correct.
The cost of prevention for this project has been estimated as $78,500 and from the development you
have learned that the average cost of detection was $1,250 and the average cost of internal failure
was $7,450
Which one of the following statements about cost of quality is TRUE? SELECT ONE OPTION
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 4
Your test process is fully integrated into the software development lifecycle. You are at which TMMi
level? [1]
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 5
You have replaced informal code reviews with technical reviews for the most complex and critical
components, in an attempt to reduce the high number of defects being found during component and
integration test levels. The project manager is concerned about the costs of implementing formal
reviews and has asked you to measure whether they actually provide a return on investment.
Which three of the following metrics would be MOST effective in helping you to achieve this?
a. Identification of defect clusters across components
b. Number of lines of code reviewed
c. Number of defects found during reviews d Root cause for each defect detected
e Post-review cost of detection and internal failure per defect
f. Type of review
g. Effort to conduct the review including rework
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 6
You are a Test Manager at a company that develops mobile phone applications. Based on historical
data in your company, you have calculated the following average metrics for system testing:
• for each 100 LOC (Lines Of Code). 4 test cases are executed
• each test case takes on average 15 minutes to execute and check
• for each 1000 LOC, 5 defects are found
You have used this information to create an estimate for the system testing of a new mobile phone
application being developed to submit gas and electricity readings.
The application delivered for system testing has 50.000 lines of code. At the end of system testing,
250 defects are discovered.
Assume that:
• the system test of the new mobile phone application will require the same amount of effort as
previous applications
• defect density = number of defects/1000 LOC
• no new tools or processes have been introduced to the test team
Based only on the given information, which one of the following statements is true about this new
mobile phone application?
SELECT ONE OPTION
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 7
You are Test Manager on a new project and have estimated the test effort to be 500 days, assuming
that you will find no more than 50 defects and 5 test iterations being required. The project manager
has said the estimate is too high. Which of the following options could enable you to reduce this
estimate?
SELECT ONE OPTION
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 8
Test results are reported as "Requirements tested, passed, and failed".
What test strategy are you using? [1]
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 9
Which of the following are Test Closure activities?
a All results lodged in configuration management system - for example test plans, results, logs,
reports.
b. Plans in place for lessons to be learnt to ensure that good practices are repeated and poor
practices are not.
c. Checks undertaken to ensure that all test work is completed - all tests executed or skipped, all
defects managed to appropriate conclusion.
d. All project closure activities completed - for example customer training completed, and analysis of
vendor performance undertaken.
e. AM testing work products delivered to those that need them - for example environments/
regression test sets passed to maintenance.
f. Checks undertaken to ensure that all tests have been executed, with all defects confirmed as fixed
by retesting.
SELECT ONE OPTION
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 10
Which of the following BEST explains how test process improvement can benefit an organisation?
SELECT ONE OPTION
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 11
You are the Test Manager on a project to replace an old sales and merchandising system with one
that will be based on modern platforms.
The main requirements for the system are:
Loading sales data, sent electronically from the stores each evening, into a central database.
Producing sales reports for the merchandisers.
Producing forecast reports, used to predict demand.
Loading sales data and producing reports with the current system has frequently taken longer than
the overnight processing window allows. The Data Centre Manager requires that all batch processing
takes at least 10% less time than currently.
The Sales and Merchandising Manager is more concerned about usability because the parameter
entry will be complex.
Which option contains two key considerations that would need to be added to your test approach?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 12
Your company, which specialises in the manufacture of luxury garden furniture to the UK market, is
to embark on a project that will deliver a major update to its payment processing component,
addressing improvements to functional suitability and performance efficiency. You have just selected
a performance testing tool but it has not yet been implemented.
A decision has been made to transfer responsibility for functional system test implementation and
execution to the company's offshore test team. System test analysis and design will be performed
onshore, at the company's UK head office. You have direct management responsibility for all test
personnel, onshore and offshore.
Which of the following is a test management activity that is MOST important for this project?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 13
You are a new Test Manager on a maintenance release for an existing mature product that is
expected to be retired in the not too distant
future. The previous release had utilized a performance regression test suite written in an in-house
custom tool using the same
programming language as the product itself. This suite will most likely require tweaking to ensure it
works with the new version of the
product. While there are several members in the performance testing team, the original author of
the performance testing tool has moved on
to another company, and none of the remaining staff have a great deal of familiarity with the
performance test scripts used to test this
product.
How would you recommend this scenario be addressed? [3]
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 14
As the Test Manager for an agile project how would you BEST plan and guide the testing activities
during development? SELECT ONE OPTION
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 15
You are responsible for porting a performance testing tool to a new operating system. You are at
what stage in the tool's lifecycle? [1]
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 16
Refer to SCENARIO 2 Project 2 is to be delivered using a RAD software development model. There
will be two increments, the first will deliver a simple prototype user interface to facilitate testing of
the sound system delivered by 'Silver Sound Ltd', the second will deliver the full user interface
required for the production system.
Development of the business requirements and project plan are underway, detailed system analysis
will follow for each increment.
You have studied the test policy and risk register and must plan the next set of test activities. Which
one of the following is the MOST effective approach for this project?
SELECT ONE OPTION
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 17
You are the Test Manager of a risk-based testing effort. You develop the following graph to show
residual risk. Assume that "Risks mitigated" represents passed tests and "Risks not mitigated"
represents failed tests and other discovered failures.
Which of the following answers best represents what the graph shows? [3]


Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 18
Which of the following is an advantage of specifying test conditions at a detailed level? [1]
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 19
When summarising test planning, which of the following statements is TRUE?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 20
Assume that you are working for a company that has maintained and tested a car parking permit
system for many years. The system holds the name and address of permit holders and automatically
writes to the permit holder with a form to renew or cancel their permit each year.
The test plan states the following:
"since the system is considered a stable system. Boundary Value Analysis is the only test case design
technique that needs to be applied during testing"
Consider the following change that was detailed in the Requirements Specification for a replacement
to an existing parameter held within the system;
• The specified renewal date for each permit must be not be after 31 st January 2020. Which one of
the following is a valid test condition that satisfies both the requirement and the test plan?
SELECT ONE OPTION
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.