Free CTAL-TM Practice Test Questions and Answers (2026)

Last Update Check

View Mode
Q: 1
You have assembled the following cost of quality numbers 200 defects were found prior to release and 100 were found after. Given this information what is the total cost of quality for this project? ISTQB CTAL-TM question
Options
Q: 2
Which three of the following would be considered a good mix of technical and interpersonal skills (hard and soft), for a test team leader? a. Ability to compliment a developer. b. Presenting information regarding a test project progress to stakeholders c. Using a configuration management tool. d. Ability to read a development coding language e. Assessing a failure and documenting it correctly.
Options
Q: 3
You are planning the testing for an emergency product update required to correct a serious security issue and to improve system maintainability of a key product in your company's catalogue. It has been estimated that the historical cost to the company for the security issue in this system has been $375,000. In the last year a total of 10 reported "live' incidents were reported, resulting in a total external failure cost of S110.000 to correct. The cost of prevention for this project has been estimated as $78,500 and from the development you have learned that the average cost of detection was $1,250 and the average cost of internal failure was $7,450 Which one of the following statements about cost of quality is TRUE? SELECT ONE OPTION
Options
Q: 4
Your test process is fully integrated into the software development lifecycle. You are at which TMMi level? [1]
Options
Q: 5
You have replaced informal code reviews with technical reviews for the most complex and critical components, in an attempt to reduce the high number of defects being found during component and integration test levels. The project manager is concerned about the costs of implementing formal reviews and has asked you to measure whether they actually provide a return on investment. Which three of the following metrics would be MOST effective in helping you to achieve this? a. Identification of defect clusters across components b. Number of lines of code reviewed c. Number of defects found during reviews d Root cause for each defect detected e Post-review cost of detection and internal failure per defect f. Type of review g. Effort to conduct the review including rework
Options
Q: 6
You are a Test Manager at a company that develops mobile phone applications. Based on historical data in your company, you have calculated the following average metrics for system testing: • for each 100 LOC (Lines Of Code). 4 test cases are executed • each test case takes on average 15 minutes to execute and check • for each 1000 LOC, 5 defects are found You have used this information to create an estimate for the system testing of a new mobile phone application being developed to submit gas and electricity readings. The application delivered for system testing has 50.000 lines of code. At the end of system testing, 250 defects are discovered. Assume that: • the system test of the new mobile phone application will require the same amount of effort as previous applications • defect density = number of defects/1000 LOC • no new tools or processes have been introduced to the test team Based only on the given information, which one of the following statements is true about this new mobile phone application? SELECT ONE OPTION
Options
Q: 7
You are Test Manager on a new project and have estimated the test effort to be 500 days, assuming that you will find no more than 50 defects and 5 test iterations being required. The project manager has said the estimate is too high. Which of the following options could enable you to reduce this estimate? SELECT ONE OPTION
Options
Q: 8
Test results are reported as "Requirements tested, passed, and failed". What test strategy are you using? [1]
Options
Q: 9
Which of the following are Test Closure activities? a All results lodged in configuration management system - for example test plans, results, logs, reports. b. Plans in place for lessons to be learnt to ensure that good practices are repeated and poor practices are not. c. Checks undertaken to ensure that all test work is completed - all tests executed or skipped, all defects managed to appropriate conclusion. d. All project closure activities completed - for example customer training completed, and analysis of vendor performance undertaken. e. AM testing work products delivered to those that need them - for example environments/ regression test sets passed to maintenance. f. Checks undertaken to ensure that all tests have been executed, with all defects confirmed as fixed by retesting. SELECT ONE OPTION
Options
Q: 10
Which of the following BEST explains how test process improvement can benefit an organisation? SELECT ONE OPTION
Options
Q: 11
You are the Test Manager on a project to replace an old sales and merchandising system with one that will be based on modern platforms. The main requirements for the system are: Loading sales data, sent electronically from the stores each evening, into a central database. Producing sales reports for the merchandisers. Producing forecast reports, used to predict demand. Loading sales data and producing reports with the current system has frequently taken longer than the overnight processing window allows. The Data Centre Manager requires that all batch processing takes at least 10% less time than currently. The Sales and Merchandising Manager is more concerned about usability because the parameter entry will be complex. Which option contains two key considerations that would need to be added to your test approach?
Options
Q: 12
Your company, which specialises in the manufacture of luxury garden furniture to the UK market, is to embark on a project that will deliver a major update to its payment processing component, addressing improvements to functional suitability and performance efficiency. You have just selected a performance testing tool but it has not yet been implemented. A decision has been made to transfer responsibility for functional system test implementation and execution to the company's offshore test team. System test analysis and design will be performed onshore, at the company's UK head office. You have direct management responsibility for all test personnel, onshore and offshore. Which of the following is a test management activity that is MOST important for this project?
Options
Q: 13
You are a new Test Manager on a maintenance release for an existing mature product that is expected to be retired in the not too distant future. The previous release had utilized a performance regression test suite written in an in-house custom tool using the same programming language as the product itself. This suite will most likely require tweaking to ensure it works with the new version of the product. While there are several members in the performance testing team, the original author of the performance testing tool has moved on to another company, and none of the remaining staff have a great deal of familiarity with the performance test scripts used to test this product. How would you recommend this scenario be addressed? [3]
Options
Q: 14
As the Test Manager for an agile project how would you BEST plan and guide the testing activities during development? SELECT ONE OPTION
Options
Q: 15
You are responsible for porting a performance testing tool to a new operating system. You are at what stage in the tool's lifecycle? [1]
Options
Q: 16
Refer to SCENARIO 2 Project 2 is to be delivered using a RAD software development model. There will be two increments, the first will deliver a simple prototype user interface to facilitate testing of the sound system delivered by 'Silver Sound Ltd', the second will deliver the full user interface required for the production system. Development of the business requirements and project plan are underway, detailed system analysis will follow for each increment. You have studied the test policy and risk register and must plan the next set of test activities. Which one of the following is the MOST effective approach for this project? SELECT ONE OPTION
Options
Q: 17
You are the Test Manager of a risk-based testing effort. You develop the following graph to show residual risk. Assume that "Risks mitigated" represents passed tests and "Risks not mitigated" represents failed tests and other discovered failures. Which of the following answers best represents what the graph shows? [3] ISTQB CTAL-TM question
Options
Q: 18
Which of the following is an advantage of specifying test conditions at a detailed level? [1]
Options
Q: 19
When summarising test planning, which of the following statements is TRUE?
Options
Q: 20
Assume that you are working for a company that has maintained and tested a car parking permit system for many years. The system holds the name and address of permit holders and automatically writes to the permit holder with a form to renew or cancel their permit each year. The test plan states the following: "since the system is considered a stable system. Boundary Value Analysis is the only test case design technique that needs to be applied during testing" Consider the following change that was detailed in the Requirements Specification for a replacement to an existing parameter held within the system; • The specified renewal date for each permit must be not be after 31 st January 2020. Which one of the following is a valid test condition that satisfies both the requirement and the test plan? SELECT ONE OPTION
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top