Q: 1
Failure to cite the significant contributions of other individuals in a final manuscript for publication
violates which category of the ASQ Code of Ethics?
Options
Q: 2
A process capability analysis can best be used to
Options
Q: 3
A company's quality policy should be developed by the
Options
Q: 4
During the causes of a problem have been verified in the analysis phase of a six sigma project, they
will form the basis of the solution in Much of the following phases?
Options
Q: 5
Rank in order, from most to least effective, the controls for mitigating risk.
1. Safety devices
2. Design change
3. Training
Options
Q: 6
M in tills drawing, the symbol is being used to indicate the
H CalculatorOptions
Q: 7
Which of the following equations is used to calculate the upper control limit for an average chart?
Options
Q: 8
If a quality engineer discovers a situation in which unlabeled finished product could be shipped to
customers, what would be an appropriate preventive action to take?
Options
Q: 9
80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at
Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project
management developed a risk management plan which included a standard repair manual (SRM) to
help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now
be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided
to generate and distribute weekly alert reports of non-conformities that exceed SRM requirements
or specifications to all inspectors. They also instructed all employees involved in the creation of those
discrepancies be re-trained.
Which of the following processes may be considered a risk treatment?
Options
Q: 10
Which of the following is the correct test statistic to use for a paired-sample t test?


Options
Question 1 of 10