Q: 1
Which roles can view reports on resource utilization and availability? (Choose two.)
Options
Q: 2
What is the difference between confirm and allocate actions?
Options
Q: 3
A project expense line is a cost associated with a specific source. Examples of specific sources could include: (Choose three.)
Options
Q: 4
Which of the following states appear in the process flow indicator at the top of the Demand form by default? (Choose three.)
Options
Q: 5
Which role can configure the parameters of the demand workbench that is provided with the base system?
Options
Q: 6
Who can submit Ideas?
Options
Q: 7
In order for a business unit to have its own Idea Portal to retrieve data, what must be configured first?
Options
Q: 8
An it_pps_admin user is able to update: (Choose two.)
Options
Q: 9
This should be updated by an it_pps_admin, so that the stakeholder list will automatically populate when a user creates a demand or project.
Options
Q: 10
An it_project_manager can request resources by which of the following: (Choose two.)
Options
Q: 11
When setting-up a program, planned ROI% is calculated based on: (Choose two.)
Options
Q: 12
How does a project manager request a change to a resource plan in the requested state?
Options
Q: 13
The hourly rate is derived from the resource rate on the resource plan, if this option is selected.
Options
Q: 14
The information displayed on Project Workspace is setup in which table?
Options
Q: 15
Which capability allows users to view variances in a project’s schedule?
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE