Q: 11
Assume you have some data related to confirmation testing during system testing of a past project.
In that project 240 bug reports have been opened once, 80 were opened twice, 10 were opened
three times and no bug reports have been opened more than three times.
You estimate that a bug report, which has failed its confirmation test, costs, on average, 3 person-
hours.
Which of the following statements correctly describe the value of these confirmatory testing
activities based on cost of quality?
Number of correct responses: 1
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 12
For which of the following activities would the costs be classified as a cost of detection?
Number of correct responses: 1
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 13
During the follow-up phase the following conditions are checked:
X1. The code has been completely reviewed
X2. All the identified defects have been correctly fixed and the modified code has been compiled
successfully and run through all the static analyzers used by the project without warnings and errors
X3. The modified code is available under the configuration management system with a new version
number for the specified CI
If these conditions are fulfilled then the review process terminates.
Which of the following characteristics of a formal review is missing in this description?
Number of correct responses: 1
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 14
The following are the exit criteria described in the test plan of a software product:
EX1. The test suite for the product must ensure that at least each quality risk item is covered by at
least one test case (a quality risk item can be covered by more test cases).
EX2. All test cases in the test suite must be run during the execution phase.
EX3. Defects are classified into two categories: “C” (critical defect) and “NC” (non-critical defect). No
known C defects shall exist in the product at the end of the test execution phase.
Which of the following information is useless when the specified exit criteria is evaluated?
Number of correct responses: 1
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Question 11 of 20 · Page 2 / 2