Q: 10
An elementary school requires a renovation, selective demolition, and a major addition in order to
accommodate a growing student population. An architectural firm has prepared schematic design
plans incorporating the school's increased programmatic needs, including an enlarged library,
cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and
classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at
the beginning and end of the school day, and additional parking was provided to comply with current
zoning requirements.
The existing single-story masonry building was built in 1950. Two small additions were built later: the
north addition will be kept and repurposed, but the south addition will be demolished. The building
contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing
mechanical systems need to be replaced; new systems have not been selected.
Considerations for the renovation include:
•
The relocated front entrance must be easily recognizable, highly visible, and secure.
•
Interior and exterior materials need to be durable and maintainable in order to withstand
frequent student abuse, but also economical due to strict budget limitations.
•
Good indoor air quality and increased energy efficiency are priorities for the selection of
mechanical equipment.
After completion, the entire school should look uniform, without a distinctive difference between
the existing building and new addition.
Building information:
•
Construction Type is II-B.
The following resources are available for your reference:
•
Existing Plans, including site and floor plans
•
Proposed Plans, including site and floor plans
•
Cost Analysis
•
Zoning Ordinance Excerpts, for off-street parking requirements
•
IBC Excerpts, showing relevant code sections
•
ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible
Design
The project team decides to cover the roof area above the gymnasium and platform with 350 watt,
stationary, photovoltaic (PV) panels. Each panel requires 20 square feet, accounting for access aisles
and safety clearances. The PV system will be tied to the local power company's electrical grid, and
will not have battery storage. The school is located in a region that gets an average of 4 usable hours
of sunlight per day.
Which of the following PV system design considerations apply to this project? Check the three that
apply.
Refer to the project involving an elementary school renovation and addition with photovoltaic (PV)
panels on the gymnasium roof (350-watt panels, 20 sq ft each, ~4 usable sunlight hours/day). The PV
system is grid-tied without battery storage.
Which of the following PV system design considerations apply? Check the three that apply.