1. NetApp AFF A400 and FAS8700 Installation and Setup Instructions
Section: "Step 1: Prepare your site". This guide
applicable to systems that can be deployed in a switchless configuration
explicitly lists verifying rack space and power as primary site preparation tasks. It states
"Verify that your rack has enough space for the equipment..." and "Verify that you have the required power...".
2. NetApp Hardware Universe (hwu.netapp.com)
Specifications for DS224C Disk Shelf. The official specifications confirm that a DS224C shelf occupies 2U of rack space and details its specific power consumption requirements
underscoring the need to verify both rack units and power capacity during a site survey.
3. NetApp Universal SAS and ACP Cabling Guide
Section: "Cabling a two-node switchless cluster". This document illustrates the physical connectivity but implicitly relies on the pre-deployment assumption that rack space and power for all components have been properly planned and verified. The physical placement shown in diagrams requires available rack units.