Q: 1
Exhibit.
You want to configure a UTA2 port as an FCoE target. Referring to the exhibit, which action must be
performed?
You want to configure a UTA2 port as an FCoE target. Referring to the exhibit, which action must be
performed?Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
The host in the exhibit is connected to a 4-node ONTAP SAN using dual-fabric implementation. LUNs
have been mapped LUN through all available UFs on nil (our nodes. Switch 2 is powered off for high-
availability testing.
How many paths per LUN would you expect the host to see in this scenario?
Dining a data mobility test on a 4-node ONTAP 9.3 cluster, the host loses direct access to its LUNs.
The LUNs are hosting on node cl1-01 and are being moved to cl1-03 on a different HA pair.
Referring to the exhibit, which corrective step is needed to ensure access while the volume is
moved?
You need to configure the SnapCenter Plug-in for VMware vSphere to back up and restore VMware
datastores.
Referring to the exhibit, which additional LIF type should you create before you configure the plug-
in?
An administrator has an AFF A200 HA pair.
Referring to the exhibit, how many 10 Gbps connections would the customer have on a single node
for SAN host connectivity?
Referring to the exhibit, which FC LIF would cause a path failure on a host connecting to a LUN?