View Mode
Q: 11
An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention. Which of the following Is an objective of this prerequisite?
Options
Q: 12
Which of the following can be Included as non-buildable land?
Options
Q: 13
A project site Includes 3.500 ft. (1.067 m) of streets, excluding driveways and utility vaults. How many street trees must be planted to meet the minimum requirements or Neighborhood Pattern and Design Credit. Tree-Lined and Shaded Streetscapes. Option 1: Tree-Lined Blocks?
Options
Q: 14
A local zoning code limits density on a residentially-zoned 10-acre (four hectare) parcel to 65 total units The site la outside of walking distance to transit service. How could this project be eligible for Neighborhood Pattern and Design Prerequisite Compact Development?
Options
Q: 15
A standardized base map that should be used throughout the submission to illustrate relevant surrounding features for up to 1 mi. (1.6 km) around the project boundary is a
Options
Q: 16
An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve Smart Location and Linkage Credit. Steep Slope Protection, what possible percentage of the site could be developed?
Options
Q: 17
A LEED for Neighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process. The protect team has secured an agreement with the transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?
Options
Q: 18
What factor determines the percentage of undeveloped land that must remain undisturbed for Green Infrastructure and Buildings Credit. Minimized Site Disturbance?
Options
Q: 19
A seven-story mixed-use project Has a zoning setback requirement of 40 ft. (12 m). street level retail along 75% of Its block length and an at-grade parking garage entryway along the remaining 25% of the block length. Which of the following strategies will improve the project's walkability?
Options
Q: 20
Project plans call for 60 detached single-family homes. 120 attached three-story townhomes, and an apartment budding with 100 dwelling units in five stones. Which choice below satisfies the requirements of Neighborhood Pattern and Development Credit Visitability and Universal Design?
Options
Question 11 of 20 · Page 2 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE