Q: 11
An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings
Prerequisite Construction Activity Pollution Prevention. Which of the following Is an objective of this
prerequisite?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 12
Which of the following can be Included as non-buildable land?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 13
A project site Includes 3.500 ft. (1.067 m) of streets, excluding driveways and utility vaults. How
many street trees must be planted to meet the minimum requirements or Neighborhood Pattern and
Design Credit. Tree-Lined and Shaded Streetscapes. Option 1: Tree-Lined Blocks?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 14
A local zoning code limits density on a residentially-zoned 10-acre (four hectare) parcel to 65 total
units The site la outside of walking distance to transit service. How could this project be eligible for
Neighborhood Pattern and Design Prerequisite Compact Development?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 15
A standardized base map that should be used throughout the submission to illustrate relevant
surrounding features for up to 1 mi. (1.6 km) around the project boundary is a
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 16
An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To
achieve Smart Location and Linkage Credit. Steep Slope Protection, what possible percentage of the
site could be developed?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 17
A LEED for Neighborhood Development project is going to temporarily reroute existing transit service
outside the required distances as pan or the construction process. The protect team has secured an
agreement with the transit agency to restore the rerouted service. What is the maximum number of
years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to
Quality Transit?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 18
What factor determines the percentage of undeveloped land that must remain undisturbed for
Green Infrastructure and Buildings Credit. Minimized Site Disturbance?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 19
A seven-story mixed-use project Has a zoning setback requirement of 40 ft. (12 m). street level retail
along 75% of Its block length and an at-grade parking garage entryway along the remaining 25% of
the block length. Which of the following strategies will improve the project's walkability?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 20
Project plans call for 60 detached single-family homes. 120 attached three-story townhomes, and an
apartment budding with 100 dwelling units in five stones. Which choice below satisfies the
requirements of Neighborhood Pattern and Development Credit Visitability and Universal Design?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Question 11 of 20 · Page 2 / 2