View Mode
Q: 1
After the HVAC contractor has completed the rough-in installation of all air handling equipment, what step should be taken to achieve Indoor Environmental Quality Credit, Contaminant Control during construction?
Options
Q: 2
Which of the following areas may be considered open space to obtain Location and Transportation Credit, Site Selection, Option 3: Open Space when located within 1/2 mile (800 meters) of a LEED for Homes project?
Options
Q: 3
Which of the following information about showers is necessary to calculate Indoor Water Baseline Consumption?
Options
Q: 4
In order to take advantage of mountain views, a designer would like to include large glazing areas in a new home. Energy and Atmosphere Credit, Windows requires more stringent window performance if the:
Options
Q: 5
Conditioned floor area and number of bedrooms are factors when calculating a project's Home Size Adjustment in order to achieve credit for:
Options
Q: 6
50% of a new LEED home exterior is clad with salvaged brick; the remaining 50% is clad with wood. In order to earn a point under Materials and Resources Credit, Environmentally Preferable Products, which of the following must be true?
Options
Q: 7
How is credit earned under Regional Priority Credit, Regional Priority when the credit has multiple thresholds?
Options
Q: 8
For a one-bedroom unit in a multi-family building, the minimum bathroom airflow requirement for intermittent local exhaust is:
Options
Q: 9
What is the intent of Innovation Prerequisite: Preliminary Rating?
Options
Q: 10
To support acoustic comfort in a home, the maximum sone level for bathroom exhaust fans is:
Options
Question 1 of 20 · Page 1 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE