Q: 11
For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle
Facilities, the bicycle network must connect to
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 12
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method,
projects must demonstrate
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 13
Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite,
Indoor Water Use Reduction?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 14
Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of
residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 15
Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite,
Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy
Design Guide?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 16
Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle
Impact Reduction?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 17
According to the Integrative Process Credit, the discovery phase of energy-related systems should
identify
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 18
Which of the following strategies can be used to achieve a point in Innovation Credit, Innovation,
Option 1.Innovation?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 19
An HVAC system consists of an air handler supplying conditioned air (mixture of return air and
outdoor air) to an office, corridor, conference room and lobby. For Indoor Environmental Quality
Prerequisite, Minimum Indoor Air Quality Performance, the ventilation rate procedure calculations
must be based upon what HVAC system configuration?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 20
A LEED Building Design and Construction: Schools project pursuing Location and Transportation
Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action
must the project take to meet the Option 2 requirements?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Question 11 of 20 · Page 2 / 2