To add a second HPE Synergy frame to an existing logical enclosure, the customer needs to join the
new enclosure to the management ring and modify the Logical Interconnect Group (LIG) to add the
new frame. This process involves:
Joining the New Enclosure to the Management Ring: Physically connect the new Synergy frame to
the existing frames using the Frame Link Modules (FLMs). This extends the management network,
allowing HPE OneView to discover and manage the new enclosure.
Modifying the Logical Interconnect Group (LIG): Update the existing LIG to include the interconnect
modules of the new frame. This ensures that network configurations are consistent across all frames
in the logical enclosure.
Adding the Enclosure to the Logical Enclosure: In HPE OneView, add the new enclosure to the
existing logical enclosure. This integrates the new frame into the managed environment, allowing
server profiles and resources to be utilized seamlessly.
Reference:
HPE OneView for Synergy User Guide: Expanding Logical Enclosures
Discusses steps to add frames to an existing logical enclosure without disruption.
HPE Synergy Configuration and Compatibility Guide: Provides detailed instructions on managing
frames and enclosures within HPE OneView.