Prior to installing the managed package for Energy and Utilities Cloud, two critical Product Schedules
settings must be enabled for all products to ensure a successful installation: Product Scheduling and
Quantity Scheduling. These settings are prerequisite steps that enable the system to handle and
manage the scheduling of products over time, crucial for the energy and utilities sector where
products and services often have associated schedules for delivery, usage, and billing. Ensuring these
settings are enabled allows for the seamless integration and functionality of the Energy and Utilities
Cloud package with the existing Salesforce environment. Reference = Salesforce's setup and
installation guides for Energy and Utilities Cloud specifically mention the requirement to enable
Product Scheduling and Quantity Scheduling as part of the preparation steps before package
installation. This information can be found in the Salesforce Help documentation related to product
schedules: https://help.salesforce.com/articleView?id=products_schedules_overview.htm&type=5