Which artifacts are part of the Solution Adoption workstream? Note: There are 3 correct answers to
this question.
Options
Discussion
Pretty sure it's A C D. Solution Adoption covers the transition stuff, and Detailed Design feels like it should fit here along with Learning Content and Change Management Roadmap.
C/D? Saw a similar set in a practice exam, and B C D were the ones called out as Solution Adoption deliverables. Just don't see Detailed Design or Project Plan fitting for this stream. Someone correct me if that's off.
Option B C D
Pretty sure the right picks are B, C, and D since those all fit with training, learning analysis, and change management. A feels more like it's tied to process design and E's just the standard project side. Anyone see it differently?
Makes sense to me: B, C, and D all tie into change management and training for Solution Adoption. A is too focused on process design and E is just project planning. Pretty sure SAP intends B C D here, but open to feedback if I missed something.
Yeah, definitely looks like B C D for Solution Adoption. Those are all focused on user enablement and change management, not process design or generic project planning. I think that's what SAP wants here but correct me if I'm off.
Doesn't the answer change if "Solution Adoption" is interpreted as covering only user enablement? Then Detailed Design (A) wouldn't fit at all.
C/D? Detailed Design (A) always looks tempting but that's design not adoption.
A C D imo. I've seen similar questions in practice exams where Detailed Design (A) was listed as part of Solution Adoption since it supports business process transitions, and Learning Content (C) plus Change Management Roadmap (D) are obviously relevant. Not totally sure B isn't included, but A seems like a fit to me-correct me if I'm off.
Its B C D