Q: 1
A deployment engineer arrives on-site to install an XE9680 server. The server lift does not have the
ability to maneuver beneath the XE9680 shipping pallet.
How many people must you have to physically pick up the server to place it on the lift shelf?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 2
A deployment engineer installed and powered on a XE8640 server. The Linux operating system is
installed. They need to update the drivers on the server.
What is a consideration before updating the driver?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 3
A deployment engineer is discussing the benefits of the PowerEdge XE9680 to a data center
manager. A customer has many PowerEdge servers. They require the greatest amount of network
throughput possible. The manager asks how many PCle risers and network PCI cards the server can
support.
What should be the response?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 4
A deployment engineer is preparing to install three PowerEdge XE9680 servers in a rack supplied by
the customer.
What must they before going on-site to install the servers?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 5
A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables
that route to switches in the data center. The administrator questions the use of a cable management
arm (CMA).
What are two items to consider when installing a CMA?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 6
A deployment engineer is installing a PowerEdge XE8640 server. The server is on a lift, and they have
aligned the server inner rails with the rail assemble that are secured in the rack. The engineer
can only push the server into the rack a short distance before it stops. Pushing forcefully causes the
rack to slide back.
What action should the deployment engineer take?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 7
DRAG DROP
What is the sequence of steps to install an XE9680 server in a new rack.


Your Answer
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 8
A deployment engineer is connecting the network cables on an XE9680 server. The data center
administrator wants to know why the server does not have an OCP card for network connectivity.
How should the engineer respond to the administrator's query?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 9
A deployment engineer is installing a PowerEdge XE8640 server in a rack with round holes. They
cannot get the outer rail portion to fit flush with the rack frame.
What is the reason the outer rail is not flush with the frame?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Question 1 of 20 · Page 1 / 2