View Mode
Q: 1
A deployment engineer arrives on-site to install an XE9680 server. The server lift does not have the ability to maneuver beneath the XE9680 shipping pallet. How many people must you have to physically pick up the server to place it on the lift shelf?
Options
Q: 2
A deployment engineer installed and powered on a XE8640 server. The Linux operating system is installed. They need to update the drivers on the server. What is a consideration before updating the driver?
Options
Q: 3
A deployment engineer is discussing the benefits of the PowerEdge XE9680 to a data center manager. A customer has many PowerEdge servers. They require the greatest amount of network throughput possible. The manager asks how many PCle risers and network PCI cards the server can support. What should be the response?
Options
Q: 4
A deployment engineer is preparing to install three PowerEdge XE9680 servers in a rack supplied by the customer. What must they before going on-site to install the servers?
Options
Q: 5
A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cable management arm (CMA). What are two items to consider when installing a CMA?
Options
Q: 6
A deployment engineer is installing a PowerEdge XE8640 server. The server is on a lift, and they have aligned the server inner rails with the rail assemble that are secured in the rack. The engineer can only push the server into the rack a short distance before it stops. Pushing forcefully causes the rack to slide back. What action should the deployment engineer take?
Options
Q: 7
DRAG DROP What is the sequence of steps to install an XE9680 server in a new rack. Dell D PEXE IN A 00 question
Your Answer
Q: 8
A deployment engineer is connecting the network cables on an XE9680 server. The data center administrator wants to know why the server does not have an OCP card for network connectivity. How should the engineer respond to the administrator's query?
Options
Q: 9
A deployment engineer is installing a PowerEdge XE8640 server in a rack with round holes. They cannot get the outer rail portion to fit flush with the rack frame. What is the reason the outer rail is not flush with the frame?
Options
Q: 10
What must be considered regarding stab-in rails with installing a PowerEdge XE server?
Options
Question 1 of 20 · Page 1 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE