Q: 1
What is used to calculate how long it will take to complete a task?
Options
Q: 2
Resource planning includes changes in all of the following EXCEPT:
Options
Q: 3
There are two ways to determining the capacity available; out of which is figured from historical data and is based on available time, utilization and efficiency.
Options
Q: 4
Which of the following strategies is most likely to produce the shortest delivery leadtime?
Options
Q: 5
is the sum of queue, setup, run, wait and move times at work center.
Options
Q: 6
The old saying “What you do not measure, you cannot control”, is as valid today as it was when first stated. The necessary step/s in implementing a successful performance measurement program is/are:
Options
Q: 7
Strategic business plans are usually reviewed
Options
Q: 8
Changing the load may not de the preferred course of action. In short run, capacity can be adjusted. Some ways that this may be done are as follows EXCEPT?
Options
Q: 9
Frozen zone, slushy zone and liquid zone are the part of
Options
Q: 10
In the previous problem how much actual time will be needed to run the order if the work center has an efficiency of 120% and a utilization of 80%?
Options
Question 1 of 20 · Page 1 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE