Senior management wants to thoroughly test a disaster recovery plan (DRP) for a mission-critical
system. Which of the following would provide the MOST reliable results?
Options
Discussion
I figured it was B here. Since a parallel test runs the system at both sites, it seems pretty solid for reliability to me. Let me know if I'm missing something.
Pretty sure A here since full interruption is the most reliable, though risky. But if the question said "safest" instead of "most reliable," wouldn't that move us to B or C instead?
Be respectful. No spam.