Q: 19
Senior management wants to thoroughly test a disaster recovery plan (DRP) for a mission-critical
system. Which of the following would provide the MOST reliable results?
Options
Discussion
Option A. Full interruption test
B, not A. Full interruption test is the most reliable because it's a full cutover, even though it's riskier. If they're asking about reliability and not safety, A makes sense here.
I figured it was B here. Since a parallel test runs the system at both sites, it seems pretty solid for reliability to me. Let me know if I'm missing something.
Its B, a parallel test makes sense since you can compare results at both sites and avoid big risks.
Pretty sure A here since full interruption is the most reliable, though risky. But if the question said "safest" instead of "most reliable," wouldn't that move us to B or C instead?