Q: 11
A battery bank has 800 Ah total capacity. How much charging current should the rectifier be able to supply?
Options
Q: 12
The 'maximum exposed area' of the fire-rated glass is defined by the supplier as 3 sqm/32 sqft. The window area is 4 sqm/43 sqft. What would be the best option?
Options
Q: 13
What is the advantage or disadvantage of using MPO (Multi-fiber Push On)/pre-terminated fiber?
Options
Q: 14
What is the main advantage of using an End-of-Row (EoR) design?
Options
Q: 15
A data center requires an audit to find out whether it conforms with ANSI/TIA-942 Rated-3 (concurrently maintainable). Will the network architecture be part of this audit?
Options
Q: 16
A computer room needs to be fitted out with a gas-based fire suppression system. The computer room will be a high-density data center with about 30% of the racks being closed circuit cooling blade-center racks. Should the supplier of the fire suppression system be informed on the design of the racks?
Options
Q: 17
When designing a data center network, your company wants to minimize the number of network cables to install. What type of physical cabling layout would be the best choice?
Options
Q: 18
What is the first step in the design stage of the data center life cycle?
Options
Q: 19
What is the main disadvantage of using a ToR (Top of Rack) design?
Options
Q: 20
A computer room with raised floor and hot/cold aisles is designed. What is the minimum required distance between the air-conditioner outlet and the first rack?
Options
Question 11 of 20 · Page 2 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE