Q: 9
You want to use automatic conversion of purchase requisitions into purchase orders for some raw
materials. What are the prerequisites?
Note: There are 3 correct answers to this question.
Options
Discussion
Pretty sure it's B C D, not E. Source list (E) isn't always a system requirement here.
B C D tbh, seen this type of question in practice tests. Both auto PO indicators (material and BP) and a valid source are the real triggers for auto PR to PO conversion. If you want to be safe, check these in official SAP docs.
Its B, C, and D here. Both auto PO indicators (material master and BP master) must be set, plus the requisition needs an assigned valid source of supply. E would only matter if plant config strictly requires a source list, which isn't always the case. Pretty sure this is what SAP expects but open to counterpoints.
E . I've seen some docs saying the plant-specific source list entry (E) is required for automated PR to PO in some scenarios, so I thought it was necessary. B and C make sense, but maybe I'm missing something here.
Option B, C and D. Plant and vendor need the automatic PO indicator ticked, and source must be assigned on the requisition for this to work in SAP. Don't see A or E as required unless it specifically called out contracts or source lists only. Let me know if you see it differently.
B C D, no doubt here.
A is wrong, B C D.
Yeah, it's B, C, D.
Probably B, C, D. Saw similar questions in practice tests and the official SAP guide covers these master data prerequisites pretty clearly.