To set up a general maintenance task list for inspection rounds using the overall time confirmation as
a simplified way to record measurement documents, you need to do the following steps:
Assign a piece of equipment with an allocated measuring point to a task list operation. This will allow
you to inspect the equipment and record the measurement readings for the measuring point during
the inspection round. You can assign the equipment either manually or automatically using the
object list in the task list header1.
Assign a measuring point as a production resources/tools (PRT) to a task list operation. This will allow
you to inspect the measuring point and record the measurement readings for it during the inspection
round. You can assign the measuring point either manually or automatically using the PRT category
0010 (Measuring Point) in the task list operation1.
You do not need to assign an inspection lot to the task list header, as this is not required for
inspection rounds. Inspection lots are used for quality inspections that are triggered by events such
as goods receipt, production order, or sales order2.
You do not need to assign an inspection document as a PRT to the task list operation, as this is not
supported for inspection rounds. Inspection documents are used for quality inspections that are
based on inspection plans and inspection characteristics2. Reference: PM - General maintenance task
list and Set up your SAP S/4HANA system for EAM Inspection Checklists in SAP Help Portal.