Q: 6
What does a work center control? Note: There are 2 correct answers to this question.
Options
Discussion
Yeah, this matches what I learned. A and C are correct.
Option D I thought valuation of BOM components was tied to work center activity sometimes, since costing links can overlap. But maybe that's a stretch for most SAP default scenarios. If anyone has seen D accepted in past practice, let me know!
Makes sense, A and C are right. Release of production orders happens at the order level and BOM valuation is more about material management, not the work center.
I don’t think it’s B. A and C fit because work centers handle capacity and costs, not order release. SAP usually manages those separately. Open to another view if someone thinks differently.
Its A and C, since work centers handle both the cost calculations for work performed and capacity availability. Release of orders and BOM valuation aren't their job here. Pretty sure, but correct me if I'm missing something.
A. C. Always see cost calculation and capacity tied to the work center in SAP basics.
A and C tbh
A and C tbh, that's what appears in SAP basic config. Work center handles cost calcs and capacity, not order release or BOM valuation. If someone has seen B as valid in a real config, let me know, but pretty sure it's just A and C.
Its A and C, seen this combo in SAP official study material and sample exams.
Order release can be tied to the work center config in special cases, so B.
Be respectful. No spam.