View Mode
Q: 1
[Installation Procedures] If the refractory lining is required before pressure testing, all pressure-retaining welds shall:
Options
Q: 2
[Material Requirements] Each sample tested in accordance with ASTM C181 for workability index shall consist of how many specimens?
Options
Q: 3
[Terms, Definitions, and Abbreviations] Materials that are easily reduced to a granular or powdery condition after placement are known as:
Options
Q: 4
[Installation Procedures] What characteristic shall be required for form selection?
Options
Q: 5

DRAG DROP [Installation Procedures] Test results received from cast sample mock-ups will serve to qualify the: American Petroleum Institute (API) 936 question

Drag & Drop
Q: 6
[Curing and Dryout] In accordance with TR 980, when curing a high-purity, low-cement castable for a high-temperature unit, which of the following sequences ensures minimum cracking risk?
Options
Q: 7

DRAG DROP [Inspection and Testing Requirements] Which factors must be the same when retesting a sample that fails to meet specification? American Petroleum Institute (API) 936 question

Drag & Drop
Q: 8
[Installation Procedures] If application of hydraulic bonded or chemical setting refractory is interrupted, the refractory lining shall be:
Options
Q: 9
[Material Requirements] Which of the following conditions must be met for test results from trial mixes of low cement castables to be accepted for qualification?
Options
Q: 10
[Inspection and Testing Requirements] Gunning test panels are constructed with removable back panels:
Options
Question 1 of 20 · Page 1 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE