DRAG DROP Match the customer issue with a VMware Horizon View solution.
DRAG DROP A company has several applications that are being moved to a Horizon environment. An architect has been given several application types and is designing an environment to accommodate all of the applications. List of applications: • WebSeller – a cloud-based application that is single sign-on capable. • SalesCalc – a Windows application that needs a very old version of Java and needs to be accessed offline. • AppOffice – a group of Windows based application that needs to be deployed together to an existing View linked clone desktop pool for the remote sales team. • RelationCRM – a server-based application that is currently accessed via RDP. Match each application with its appropriate deployment method.
DRAG DROP Drag and drop the latency measurement into its correct position within the image.
DRAG DROP A company has several applications that are being moved to a Horizon environment. An architect has been given several application types and is designing an environment to accommodate all of the applications. List of applications: • WebSeller – a cloud-based application that is single sign-on capable. • RoloContact – a Windows application that utilizes an Internet Explorer 6 and an IE plugin, but needs to be deployed to Windows 8 desktops. • AppOffice – a group of Windows based application that needs to be deployed together to an existing View linked clone desktop pool for the remote sales team. • RelationCRM – a server-based application that is currently accessed via RDP. Match each application with its appropriate deployment method.
DRAG DROP A customer has an aging storage array that must be replaced. The array is used by VMware hosts in their data center. The storage array is under warranty, but the hosts are all out of warranty. The customer wants new hardware running Horizon 7, and is open to a hyperconverged solution. The project must take place with minimal-to-no disruption during normal business hours. The CIO states there is a maximum budget of $600, 000 for the project. The IT Director says their UPS units were replaced last year and they don’t need to be updated. The existing racks are heavily populated, with limited rack units remaining and no additional datacenter floorspace for another rack. Match the statements taken from the scenario with its correct design category.




