Q: 11
Refer to the exhibit. 300-630 question An engineer must have communication between EPG1 in VRF1 and External EPG in VRF2. Which three actions should be taken for the defined subnets in the L3Out External EPG to accomplish this goal? (Choose three.)
Options
Q: 12
A packet is routed between two endpoints on different Cisco ACI leaf switches. Which VXLAN VNID is applied to the packet?
Options
Q: 13
What are two P8R characteristics of the Cisco ACI Active-Active Across Pods deployment mode in Cisco ACI Multi-Pod design? (Choose two.)
Options
Q: 14
What is the purpose of the Forwarding Tag (FTAG) in Cisco ACI?
Options
Q: 15
An engineer troubleshoots a Cisco ACI fabric and receives this output. 300-630 question What does tunnel 6 use?
Options
Q: 16
As part of a newly deployed ACI fabric, a pair of border leaf switches have been deployed to provide shared services for all tenants. The configured L3Out runs OSPF as the routing protocol. The requirement is to advertise the routes from the border leaf switches to the compute leaf switches. Which configuration must be implemented to meet these requirements?
Options
Q: 17
Refer to the exhibit. 300-630 question An engineer must allow IP mobility between Site1 and Site2 in a Cisco Nexus Dashboard Orchestrator. The design must meet these requirements: • A disaster recovery (DR) solution must exist between the sites that do not require vMotion support • The application must be started at a DR site without having to re-IP the application servers • The solution must avoid any broadcast storms between the sites. Which two actions meet these criteria? (Choose two.)
Options
Q: 18
An engineer must allow routes learned from one L3Out to be advertised out another L3Out. The engineer does not have an explicit list of all the routes that must be advertised out, however, they know that they are all part of the 10.16.0.0/16 CIDR block. Which attributes must be selected under Ext-EPG to allow the necessary routes to be advertised out?
Options
Q: 19
Refer to the exhibit. 300-630 question A company decided to decrease its routing footprint and remove RT-2 and RT-3 devices from its data center. Because of that, the exit point must be created from all the tenants by using the common tenant. Which two configuration tasks must be completed to meet these requirements? {Choose two.)
Options
Q: 20
Refer to the exhibit. 300-630 question In a Cisco ACI Multi-Site deployment, traffic fails to pass between Site-A and Site-B. and an engineer troubleshoots the link between ISN-01 and Node-201. Which set of actions establishes connectivity?
Options
Question 11 of 20 · Page 2 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE