View Mode
Q: 1
Which statement is true about Oracle Database 19c SGA Management?
Options
Q: 2
Examine these descriptions of ASM instance shutdown behavior: 1) The ASM instance shuts down immediately without an orderly dismount of disk groups. 2) Active SQL statements are allowed to complete before an orderly dismount of all disk groups occurs and then the ASM instance shuts down without waiting for connected sessions to disconnect. If any ASM clients are connected to the instance, then the shutdown returns an error. 3) Active SQL statements are allowed to complete before an orderly dismount of all of disk groups occurs and then the ASM instance shuts down after waiting for connected sessions to disconnect. If any ASM clients are connected to the instance, then the shutdown returns an error. Which two lists are correct matches for these descriptions? (Choose two.)
Options
Q: 3
Which statement is true concerning the installation of an Oracle Grid Infrastructure 19c patchset and its status during the installation?
Options
Q: 4
Which three statements are true about ASM Cloud File System (ACFS) encryption? (Choose three.)
Options
Q: 5
Disk group DGRP1 has these attributes: 1. Normal redundancy 2. Two failure groups FG1 and FG2 with two disks each 3. Compatibility settings set to 19.0 The FG1 failure group goes offline due to hardware failure. Which two statements are true? (Choose two.)
Options
Q: 6

You support a RAC database with these characteristics: 1. There are six instances. 2. Server Pool prod has a maximum of four servers. 3. CRM is a policy managed, uniform service using Server Pool prod. 4. ERP is a policy managed, singleton service using Server Pool prod. 5. Grid infrastructure is installed and running in its default configuration. Which four benefits are provided by this configuration in Oracle 19c? (Choose four.)

Options
Q: 7
Which statement describes the purpose of colocation_tag for client routing with Oracle database 19c?
Options
Q: 8
Examine this command: SQL> CREATE PLUGGABLE DATABASE pdb3 FROM pdb1; Which three conditions must be true for successful execution of this command on a RAC database? (Choose three.)
Options
Q: 9
Identify three prerequisites for the successful installation of Oracle Grid Infrastructure 19c when using Full Featured Grid Naming Service (GNS). (Choose three.)
Options
Q: 10
Which three statements are true about fully qualified file names in ASM? (Choose three.)
Options
Question 1 of 20 · Page 1 / 2

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE