Q: 1
What is used to calculate how long it will take to complete a task?
Options
Q: 2
Resource planning includes changes in all of the following EXCEPT:
Options
Q: 3
There are two ways to determining the capacity available; out of which is figured from historical data and is based on available time, utilization and efficiency.
Options
Q: 4
Which of the following strategies is most likely to produce the shortest delivery leadtime?
Options
Q: 5
is the sum of queue, setup, run, wait and move times at work center.
Options
Q: 6
The old saying “What you do not measure, you cannot control”, is as valid today as it was when first stated. The necessary step/s in implementing a successful performance measurement program is/are:
Options
Q: 7
Strategic business plans are usually reviewed
Options
Q: 8
Changing the load may not de the preferred course of action. In short run, capacity can be adjusted. Some ways that this may be done are as follows EXCEPT?
Options
Q: 9
Frozen zone, slushy zone and liquid zone are the part of
Options
Q: 10
In the previous problem how much actual time will be needed to run the order if the work center has an efficiency of 120% and a utilization of 80%?
Options
Q: 11
If the cost of direct material is 60%, direct labor is 10%, and overhead is 25%of sales what will be the improvement in profit if direct material is reduced to 55%?
Options
Q: 12
Which one of the following is NOT done by PAC in control phase?
Options
Q: 13
On the overage a company has 12week of work-in-process (WIP) inventory and annual cost of goods sold of 36$ million. Assuming the company works 50 weeks per year. What is the dollar value of the WIP?
Options
Q: 14
It provides a yard stick for measuring work content and unit for stating capacity. What is it?
Options
Q: 15
For a particular commodity, the line-haul cost is $2.50 per mile. For a trip of 500 miles and a shipment of 600 cwt., what is the cost of shipping cwt.? If this shipment is increased to 1000 cwt., what is the saving in cost per cwt.?
Options
Q: 16
Delivery lead time is the longest in case of:
Options
Q: 17
Each level of MPC (Manufacturing planning and control) differs in the following: Purpose of the plan Planning Horizon Level of detail Planning Cycle Since each level is:
Options
Q: 18
Order winning characteristics are defined primarily from:
Options
Q: 19
Exponential smoothing gives the same results as a moving average but without the need to retain as much data and with easier calculations.
Options
Q: 20
The probability of rejecting a good lot is called the consumer’s risk.
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE