What is used to calculate how long it will take to complete a task?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 2
Resource planning includes changes in all of the following EXCEPT:
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 3
There are two ways to determining the capacity available; out of which is figured from historical data
and is based on available time, utilization and efficiency.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 4
Which of the following strategies is most likely to produce the shortest delivery leadtime?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 5
is the sum of queue, setup, run, wait and move times at work center.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 6
The old saying “What you do not measure, you cannot control”, is as valid today as it was when first
stated. The necessary step/s in implementing a successful performance measurement program
is/are:
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 7
Strategic business plans are usually reviewed
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
B
Q: 8
Changing the load may not de the preferred course of action. In short run, capacity can be adjusted.
Some ways that this may be done are as follows EXCEPT?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 9
Frozen zone, slushy zone and liquid zone are the part of
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
B
Q: 10
In the previous problem how much actual time will be needed to run the order if the work center has
an efficiency of 120% and a utilization of 80%?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
C
Q: 11
If the cost of direct material is 60%, direct labor is 10%, and overhead is 25%of sales what will be the
improvement in profit if direct material is reduced to 55%?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 12
Which one of the following is NOT done by PAC in control phase?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 13
On the overage a company has 12week of work-in-process (WIP) inventory and annual cost of goods
sold of 36$ million. Assuming the company works 50 weeks per year.
What is the dollar value of the WIP?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 14
It provides a yard stick for measuring work content and unit for stating capacity. What is it?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
B
Q: 15
For a particular commodity, the line-haul cost is $2.50 per mile. For a trip of 500 miles and a
shipment of 600 cwt., what is the cost of shipping cwt.? If this shipment is increased to 1000 cwt.,
what is the saving in cost per cwt.?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
B
Q: 16
Delivery
lead time is the longest in case of:
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 17
Each level of MPC (Manufacturing planning and control) differs in the following:
Purpose of the plan
Planning Horizon
Level of detail
Planning Cycle
Since each level is:
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 18
Order winning characteristics are defined primarily from:
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
D
Q: 19
Exponential smoothing gives the same results as a moving average but without the need to retain as
much data and with easier calculations.
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Correct Answer:
A
Q: 20
The probability of rejecting a good lot is called the consumer’s risk.