ISQI IREB CPRE FL
Q: 1
Your company uses only text processing as a tool in requirements management. Which two essential
tasks for requirements management are least supported by this tool? (1 Point)
Options
Q: 2
You are project manager for a system that your company is creating for the military in the field of
logistics. A requirements engineer has been assigned to your project but does not have all the
desirable skills for this role. In respect to the attributes of the requirements engineer, which of the
following statements implies the greatest risk for the requirements engineering? (1 Point)
Options
Q: 3
You are assigned to carry out and document a system and context delimitation for a software system
that is to be developed. What diagram is least suited for the representation of the delimitation? (1
Point)
Options
Q: 4
Which two statements are correct with regard to the introduction of a requirements engineering
tool? (2 Points)
Options
Q: 5
For an interview, you have prepared a use case diagram for the system to be specified. You decide to
talk through a use case in detail with the stakeholder. You receive very useful feedback which must
now be documented. Which of the following means of expression is least suitable to document the
details of a single use case? (1 Point)
Options
Q: 6
Your company works intensively with models in requirements engineering and uses UML for the
description of models. Which three capabilities should a modeling tool possess in order to be able to
create traceable models in the requirements engineering? (3 Points)
Options
Q: 7
As part of the "UniKasso" project, the "CRETIL" company is standardising the payment methods for
all customers. The requirements specification has been created and the first release is currently
being implemented. This week, the management has decided to include the implementation of the
"credit card" mode of payment in the first release and to shift the "direct debit" mode of payment to
the second release. The test manager receives the order to adjust the test planning accordingly.
Which particular characteristic of the requirements will facilitate the work of the test manager
significantly in this respect? (1 Point)
Options
Q: 8
As input for the system development, the Board of Directors of an automotive manufacturer has
specified the following goals:
1. The infotainment system should be easy to operate.
2. The user must be able to operate the system without becoming distracted from the road traffic.
3. The system should function without an additional power source.
4. The system should be configurable for various models of car.
With which two approaches can these goals be detailed and refined best? (2 Points)
Options
Q: 9
You model invoices and invoice items with a UML class diagram. Explanation: The total amount of an
invoice is calculated by summing up all individual invoice items. This means that an invoice showing
5 article prices contains 5 invoice items. What model element most accurately describes the
relationship between invoice and invoice items? (1 Point)
Options
Q: 10
Which of the following statements best characterizes the relationship between a requirements
engineer and a stakeholder in the role of a tester? (1 Point)
Options
Question 1 of 10