AACE International PSP
Q: 1
What are Phases based on and derived from?
Options
Q: 2
The expected remaining cost needed to complete an activity, group of activities or the project is
the____________.
Options
Q: 3
Which of the following will NOT affect the total float calculation of a non-resource leveled schedule?
Options
Q: 4
Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift
bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?


Options
Q: 5
What is a key first step in developing a critical path method schedule?
Options
Q: 6
Which of these letters, symbols or words best approximates the graphical shape of a project's
cumulative BCWS?
Options
Q: 7
Which of the following are NOT normally included in the project scope statement, either directly or
by reference?
Options
Q: 8
Is activity 7001 pictured correctly in the precedence diagram?


Options
Q: 9
Which of the following types of delay will NOT result in a time extension and additional
compensation for a contractor?
Options
Q: 10
In the "normal" schedule, excluding Activity 1000, what activity(s) are concurrent with Activity 3001?


Options
Question 1 of 10