As part of a Visual Factory plan _____________ are created and utilized to identify areas in need of cleaning and organization.
Options
Q: 2
If a set of data is generally centered relative to the targeted value but is rather widely disbursed it would be said to be _____________.
Options
Q: 3
As we conceive and define a LSS project one of the overriding things we hope to accomplish is to reduce the _____________________.
Options
Q: 4
The ROI for a project is a measurement metric that stands for _____________________ and is one of the methods used to measure the success of a Lean Six Sigma project.
Options
Q: 5
A tool we use to identify possible failures (defects) in our process and the impact they may have is the _________________.
Options
Q: 6
Benefits and working conditions would be primarily the concern of which of the following?
Options
Q: 7
To construct a Fishbone Diagram and capture all the issues of interest it is best if your team uses the ________________ approach.
Options
Q: 8
In the expression Y = f(Xn) Y, the output, is the ___________ variable and Xn, the inputs, are the __________ variables.
Options
Q: 9
Training cost $2,500 and a project required an initial investment of $23,500. If the project yields monthly savings of $2,500 beginning after 4 months, what is the payback period in months (before money costs and taxes)?
Options
Q: 10
The RPN or Risk Priority Number is used to rank the various Failure Modes as to their impact on the output of the subject process.
Options
Q: 11
As we attempt to find a commonality of terms to assess the performance of a broad range of processes we use a key metric called the DPMO which stands for __________________________?
Options
Q: 12
As we identify customer and supplier requirements for a SIPOC we are urged to use the RUMBA approach which stands for _____________, Understandable, Measurable, Believable and Achievable.
Options
Q: 13
Voice of the Business is a Lean Six Sigma technique to determine the needs and wants of the ______________ of the business.
Options
Q: 14
A Belt has determined that the loan application does not need to be reviewed by accounting thereby improving the number of applications a loan processer can handle. According to Cost of Poor Quality (COPQ) definitions RTY improvement would be considered _______________.
Options
Q: 15
A 5 Why Analysis is used to help identify possible defect causes when which one of the below listed tools is created?
Options
Q: 16
Inputs that may affect your process to some degree but are not critical, are difficult to quantify and are random in nature are referred to as ___________.
Options
Q: 17
When a process has proven itself to function at a Six Sigma level this means there are less than ________ defects per million opportunities.
Options
Q: 18
A Macro Process Map may map a process showing the entire activities of a department and can likely be broken into many Micro Process Maps showing numerous processes that comprise the activities of the department.
Options
Q: 19
The Control Plan is created following the finalization of the Measure Phase and can be closed when?
Options
Q: 20
The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and Control.
Options
Question 1 of 20

Premium Access Includes

  • Quiz Simulator
  • Exam Mode
  • Progress Tracking
  • Question Saving
  • Flash Cards
  • Drag & Drops
  • 3 Months Access
  • PDF Downloads
Get Premium Access
Scroll to Top

FLASH OFFER

Days
Hours
Minutes
Seconds

avail 10% DISCOUNT on YOUR PURCHASE