NCARB PROJECT MANAGEMENT
Q: 1
What does “substantial completion” mean in the context of a construction contract?
Options
Q: 2
In response to a request for qualifications for a prospective project, the architect assembles a project
team of mechanical, electrical, plumbing, and fire protection engineers.
What is the project?
Options
Q: 3
According to AIA Document A201, who is responsible for obtaining permits and licenses required for
the project?
Options
Q: 4
During the CD phase, it is discovered that the owner's food service consultant made a mistake that
results in the owner asking the architect to revise the design.
How should the architect proceed?
Options
Q: 5
Which insurance policy protects the architect against claims of negligence?
Options
Q: 6
What is the architect’s role regarding shop drawings?
Options
Q: 7
What is the primary purpose of a construction schedule?
Options
Q: 8
Which preliminary deliverables are usually provided for a schematic phase submission? Check the
four that apply.
Options
Q: 9
An architecture firm has a C401 agreement with their consultants for a new design-bid-build
residential tower. The architect has approved a schedule provided by the mechanical engineer that
includes a two-week quality control review after each delivery milestone.
During the design development phase, the owner requests that the architect change the 8,000-
square-foot business center amenity for tenants to a private restaurant. The mechanical engineer
informs the architect that their schedule must be extended by four weeks to meet the owner's
request.
What should the architecture firm do first to maintain the start of construction?
Options
Q: 10
After redesigning an existing restaurant, the architect submits the plans to the county for building
permit review. During the Zoning Review, the county requests the architect submit a site plan for
review and approval. After researching the county's records, the architect discovers a 40-year-old
approved site plan that is stamped, "Approval is based on the site plan and usage as indicated. Any
interior partitioning of the original building will be subject to review and approval by the county."
How should the architect proceed?
Options
Question 1 of 10