Pure Storage FLASHARRAY IMPLEMENTATION S…
Q: 1
On a FlashArray//XR20R2/3 Fibre Channel (FC) array, what is the default type and placement of the
PCIe FC card?
Options
Q: 2
Before installing array rails, where should the cage nuts be placed?
Options
Q: 3
What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?
Options
Q: 4
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X
during a controller upgrade.
Which command should the Implementation Engineer run on the new controller to determine its
model?
Options
Q: 5
A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the
array configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet
this requirement?
Options
Q: 6
In a situation where iSCSI cards need to be re-used during a controller upgrade, which is a valid
transfer path?
Options
Q: 7
When performing an install on a FlashArray, what step should be taken first?
Options
Q: 8
The customer has completed the installation document and has stated that the proxy server address
is “10.24.18.120”. What additional information is required?
Options
Q: 9
A customer would like to reduce SafeMode settings for retention and eradication with their current
policy.
How is authorization obtained to make the requested changes?
Options
Q: 10
What is the redundancy of the FlashArray//XL PSUs?
Options
Question 1 of 10