Free CFPE Practice Test Questions and Answers (2026) | Cert Empire Practice Questions
Free preview: 20 questions.
NFPA CFPE
Q: 1
Which of the following would not require having to submit construction documents for all fire
protection systems and the issuance of a permit by the AHJ?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 2
Which of the following is an architectural drawing that shows the overall project layout of building
areas, driveways, fences, fire hydrants, and landscape features?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 3
If a sprinkler system is supplied with water from a gravity tank, the gravity tank shall be installed in
accordance with what standard in order to be acceptable as a source of water?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 4
What is the permitted fire flow reduction for two buildings on the same lot with a separation of 40 ft
(12 m)?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 5
Draperies and decorations in day care occupancies shall comply with the provisions of which NFPA
document?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 6
The symbol above is a representation of which one of the following?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 7
Exhibit.
What is the occupancy classification of the conference rooms in the figure if they are used for
meetings of less than 50 people?
What is the occupancy classification of the conference rooms in the figure if they are used for
meetings of less than 50 people?Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 8
Exhibit.
For the included figure, which dimension is the tread depth?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 9
The tops of wall mounted audible fire alarm notification appliances shall be a minimum of what
height above the finished floor'?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 10
What is the occupancy classification of a restaurant, if it has an occupant load greater than 50
people?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 11
What is the minimum fire resistance rating for the enclosure of a floor opening in a new six-story
building?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 12
What is the minimum required rating for a fire door assembly installed in a 2-hour rated fire barrier?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 13
The responsibility to promulgate rules that cover plan review is established by
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 14
New manual fire alarm boxes must be within what distance from the door?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 15
Which of the following supporting documents is defined as illustrations and descriptions of a system
component taken from a manufacturer's catalog?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 16
Which one of the following is an architectural drawing that shows the vertical view of a building,
including floors, building height, and the grade of surrounding ground?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 17
What is the occupant load for a 3,240 ft2 (301 m2) single story, retail bicycle shop?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 18
What is the maximum nominal spacing for spot type smoke detectors on smooth ceilings?
Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 19
Exhibit.
In the figure what is the approximate length of the dead end corridor?
In the figure what is the approximate length of the dead end corridor?Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Q: 20
Exhibit.
What is the guardrail height for rampS/Stairs shown in plan A5?
What is the guardrail height for rampS/Stairs shown in plan A5?Options
Discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Question 1 of 20